SOLAR PV: positive energy from the sun

To date, we have totalled 8 MW of electricity generated by solar power from 8 self-developed,
installed and managed solar parks.

Located in Monteodorisio, this was the first Inergia plant to be built outside the Puglia region.
Municipality: Monteodorisio
Province: Chieti
Region: Abruzzo
Total installed capacity: 996,82 kW
Module power: 230 Wp
Number of modules: 4.334
Annual production: 1.288 KWh
CO2 saved: 684 t/year
Customers supplied: 480 households
Entry into service: 2010
Situated about 1 km from the “Tarantina” park.
Municipality: Spinazzola
Province: Barletta – Andria – Trani
Region: Puglia
Total installed capacity: 999,81 kW
Module power: 230 Wp
Number of modules: 4347
Annual production: 1.353 KWh
CO2 saved: 718 t/year
Customers supplied: 500 households
Entry into service: 2010
Located near parco delle Murge, this was the first plant to become operative in the municipality.
Municipality: Spinazzola
Province: Barletta – Andria – Trani
Region: Puglia
Total installed capacity: 999,81 kW
Module power: 230 Wp
Number of modules: 4.347
Annual production: 1.353 KWh
CO2 saved: 718 t/year
Customers supplied: 500 households
Entry into service: 2009
Built in just 4 months near the municipality of Canosa di Puglia.
Municipality: Canosa di Puglia
Province: Barletta – Andria – Trani
Region: Puglia
Total installed capacity: 997,92 kW
Module power: 280 Wp
Number of modules: 3.564
Annual production: 1.348 KWh
CO2 saved: 716 t/year
Customers supplied: 500 households
Entry into service: 2009
Built on farmland, the park is only about 500 meters from the Forcone park.
Municipality: Cerignola
Province: Foggia
Region: Puglia
Total installed capacity: 999,90 kW
Module power: 275 Wp
Number of modules: 3.636
Annual production: 1.343 KWh
CO2 saved: 713 t/year
Customers supplied: 500 households
Entry into service: 2009
The first solar park to be built and connected in the municipality of Cerignola.
Municipality: Cerignola
Province: Foggia
Region: Puglia
Total installed capacity: 999,90 kW
Module power: 275 Wp
Number of modules: 3.636
Annual production: 1.343 KWh
CO2 saved: 713 t/year
Customers supplied: 500 households
Entry into service: 2009
Situated on an eight-and-a-half acre site 7 km to the north-west of the chief town of Salento.
Municipality: Lecce
Province: Lecce
Region: Puglia
Total installed capacity: 994,56 kW
Module power: 185 Wp
Number of modules: 5.376
Annual production: 1.375 KWh
CO2 saved: 730 t/year
Customers supplied: 510 households
Entry into service: 2008
The first multi-technology wind farm and solar park to be built by gruppo Inergia S.p.A.
Municipality: Lecce
Province: Lecce
Region: Puglia
Total installed capacity: 994,56 kW
Module power: 185 Wp
Number of modules: 5.376
Annual production: 1.375 KWh
CO2 saved: 730 t/year
Customers supplied: 510 households
Entry into service: 2008